End product is beautiful. The five months it took to get done was not. I can still see sealant marks on the glass. A hole was left in the floor of the old shower that we had to fix. The shower head hole was just taped over. I realize we have a one of a kind shower. 94" floor base, two windows and basically 94" of glass. So I have to cut them some slack. But appointments were made that we had to take vacation days for and then they had to change at last minute due to supply issues. We lost work time to accommodate them. The glass was supposed to be frameless. Instead we got a fully framed setup. If we had known before the last days, we may have chosen a different layout.
$1,000 Off Bathroom Remodeling Projects
For a Limited Time, Save $1000 on Bathroom Remodels and Get 0% Financing for 12 months!